
Chapter 3 Maintaining the Server
Preparing for Server Component Installation
Preparing for Server Component Installation
This section describes how to prepare for component installation, and it includes the following topics:
•Required Equipment, page
•Shutting Down and Powering Off the Server, page
•Removing and Replacing the Server Top Cover, page
•Removing and Replacing the Front Chassis Panel, page
•Replaceable Component Locations, page
•Serial Number Location, page
Required Equipment
The following equipment is used to perform the procedures in this chapter:
•Number 2
•Electrostatic discharge (ESD) strap or other grounding equipment such as a grounded mat
Shutting Down and Powering Off the Server
The server can run in two power modes:
•Main power
•Standby power
You can invoke a graceful shutdown or an hard shutdown by using either of the following methods:
•Use the Cisco IMC management interface.
•Use the Power button on the server front panel. To use the Power button, follow these steps:
Step 1 Check the color of the Power Status LED (see the “Front Panel LEDs” section on page
•
•
Step 2 Invoke either a graceful shutdown or a hard shutdown:
Caution To avoid data loss or damage to your operating system, you should always invoke a graceful shutdown of the operating system.
•Graceful
•Emergency
Step 3 Disconnect the power cords from the power supplies in your server to completely power off the server.
Cisco UCS C22 Server Installation and Service Guide
| ||
|