Cisco Systems OL-7822-06 quick start Connect the AC-Input Power Supply Unit

Models: OL-7822-06

1 64
Download 64 pages 28.48 Kb
Page 20
Image 20
Connect the AC-Input Power Supply Unit

Chapter 3 Connect the Power Supply Units

Connecting the Power

Step 7 Look at the IN and OK LEDs on the power supply unit and the corresponding Power LED on the front panel. If the DC-input power supply unit is operating properly, these LEDs will be glowing green.

Step 8 Ensure that the power supply is properly aligned and the installation screw is tightened.

Connect the AC-Input Power Supply Unit

Step 1 Plug the AC-input power cable into the AC-input power receptacle on the AC-input power supply

For AC-input power, we recommend powering the SCE 2000 platform from a 120 VAC, 15A receptacle U.S. (240 VAC, 10A international) at the power source.

Figure 3-4 Connecting the AC Power

 

BYPASS 1

 

IN

POWER B

 

 

OK

 

 

IN

POWER A

 

 

OK

 

 

210423

Step 2 Plug the AC power supply cable into the AC power source.

Step 3 Turn the on/off switch to the on position.

Step 4 Look at the IN and OK LEDs on the power supply unit and the corresponding Power LED on the front panel. If the AC-input power supply unit is operating properly, these LEDs will be glowing green.

Step 5 Ensure that the power supply is properly aligned and the installation screw is tightened.

Cisco Service Control Engine 1000 2xGBE Quick Start Guide

3-4

OL-7822-06

 

 

Page 20
Image 20
Cisco Systems OL-7822-06 quick start Connect the AC-Input Power Supply Unit