Cisco Systems OL-7822-06 quick start Place the SCE 1000 platform on the tabletop or workbench

Models: OL-7822-06

1 64
Download 64 pages 28.48 Kb
Page 9
Image 9
Step 2 Place the SCE 1000 platform on the tabletop or workbench.

Chapter 1 Prepare for Installation

Workbench or Tabletop Installation

An adequate chassis ground (earth) connection exists for the SCE 1000 platform.

The SCE 1000 platform has at least 2 inches (5 cm) of clearance at each side and at least 5 inches (12.7 cm) of clearance at the rear to allow proper air flow.

Step 1 Remove the adhesive strips from the four rubber feet and affix the feet onto the four marked locations on the bottom panel of the unit.

Step 2 Place the SCE 1000 platform on the tabletop or workbench.

Cisco Service Control Engine 1000 2xGBE Quick Start Guide

 

OL-7822-06

1-3

 

 

 

Page 9
Image 9
Cisco Systems OL-7822-06 quick start Place the SCE 1000 platform on the tabletop or workbench