Cisco Systems OL-7822-06 Attach the Brackets to the SCE, Mounting Bracket for 4-post Racks

Models: OL-7822-06

1 64
Download 64 pages 28.48 Kb
Page 12
Image 12
Mounting Bracket for 4-post Racks

Chapter 2 Rack-Mount the SCE 1000

Attach the Brackets to the SCE 1000

Figure 2-2

Mounting Bracket for 4-post Racks

210430

The SCE 1000 mounts to the two front rack posts with brackets that attach to the front of the SCE 1000 The inside width between the two posts or mounting strips (left and right) must be at least 17.3 inches (44 cm).

Note Remember to leave a two-inch (5 cm) clearance on both sides of the SCE 1000 and at the rear for adequate airflow for the inlet and exhaust vents.

Attach the Brackets to the SCE 1000

Before installing the SCE 1000 in the rack, you must first install an appropriate rack-mount bracket on each side of the front of the SCE 1000, as illustrated in the following figures.

Figure 2-3

Attaching the Mounting Brackets (4-post)

MNG 1

MNG 2

 

ACLINK/ 10/100/

LINK/ 10/100/

TIVE 1000

 

ACTIVE 1000

CONSOLE

AUX

PWR A

PWR B

STATUS BYPASS

 

 

LINK RX

TX

 

LINK RX

 

 

 

 

 

TX

RX

MM

TX

 

 

 

 

 

 

 

 

RX

MM

TX

 

SUB

GBE-1

 

 

 

 

LINE

 

 

 

 

 

 

 

NET

 

Cisco

1000

SCE

2xGBE

Series

210418

 

1 2

Cisco Service Control Engine 1000 2xGBE Quick Start Guide

2-2

OL-7822-06

 

 

Page 12
Image 12
Cisco Systems OL-7822-06 quick start Attach the Brackets to the SCE, Mounting Bracket for 4-post Racks