Cornelius 3 Step, Action, Procedure, BRIX Setup Screen, Splash Panel Mounting Screws

Models: 3

1 74
Download 74 pages 15.36 Kb
Page 39
Image 39
Figure 24. BRIX Setup Screen

 

 

 

 

 

 

 

Viper Service Manual

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Table 27

 

 

 

 

 

 

 

 

Step

 

Action

 

Procedure

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

15

Replace access panel

Replace the hoses and the access panel. Secure the

 

 

 

 

 

 

panel with the two screws removed in Step 2. This

 

 

 

 

 

 

completes the procedure.

 

 

 

BRIX

 

#1 OFF

 

 

 

 

 

 

 

 

 

 

 

SETUP

 

#2 OFF

 

 

 

 

 

12:51P

 

 

 

 

 

 

 

MAR 04

 

 

 

 

 

 

 

 

 

 

 

 

BACK BRIX STOP

Figure 24. BRIX Setup Screen

Splash Panel

Retaining Screws

Figure 25. Splash Panel Mounting Screws

Product

Product

 

 

 

Product

Supply

Supply

Flow

Flow

Flow

Supply

Valve

Valve

Controls

Controls

Controls

Valve

Barrel 1

Barrel 2

Barrel 1

Barrel 2

Barrel 3 Barrel 3

Valves shown in BARREL position w/ Splash Panel & Solenoid Covers Removed

Figure 26. Product Control Valves

© 2010, IMI Cornelius Inc.

- 33 -

Publication Number: 621360041TBSER

Page 39
Image 39
Cornelius 3 service manual Step, Action, Procedure, BRIX Setup Screen, Splash Panel Mounting Screws, Product Control Valves