Emerson 208V, 10-30kVA installation manual 4.7Bolting Cabinets Together, Maintenance Bypass Cabinet

Models: 10-30kVA 208V

1 80
Download 80 pages 38.9 Kb
Page 35
Image 35
4.7Bolting Cabinets Together

Maintenance Bypass Cabinet

4.7Bolting Cabinets Together

NOTE

UPS wiring must be completed before the cabinets are bolted together.

1. Line up cabinets so that mounting holes are aligned.

Place cabinets so mounting holes are aligned.

A bolt from the adjacent cabinet may be screwed into the threaded top hole, or a bolt may be inserted through the lower hole and screwed into the threaded hole in the adjacent cabinet.

2.Using supplied hardware, bolt the cabinets together. The bolts may be inserted from either the UPS side or from the MBS side, whichever is more convenient.

29

Page 35
Image 35
Emerson 208V, 10-30kVA installation manual 4.7Bolting Cabinets Together, Maintenance Bypass Cabinet