FROM

Installation Drawings

Figure 38 Lineup detail—1+N Type A connection to NX

1 + N Parallel Cabinet

(front view without front door and panel)

1.All Liebert-supplied cable must be repositioned prior to and while setting the cabinets in their installed location.

2.All interconnection cables and hardware supplied by others.

3.AC connections must be made to the UPS modules before attaching paralleling cabinet to UPS modules

4.The interconnecting output cables between the paralleling cabinet and the UPSes must be the same size and the same length.

5.The location of the system output neutral busbar (connection K) and the ground busbar (connections H, I and J) are shown for a left-access style. For right-access version, these busbars are at opposite locations

6.Refer to the individual drawing of each piece of equipment for additional details.

Table 20 Interconnect wiring—1+N Type A connection to NX

RUN

FROM

TO

CONDUCTORS

 

 

 

 

A1-A4

Utility AC Source

UPS #1-UPS #4 Module AC Input

Ph A, B, C - UPS Input

 

 

 

 

B1-B4

Utility AC Source

UPS #1-UPS #4 Module AC Input

Neutral - UPS Input

 

 

 

 

C1-C4

UPS #1-UPS #4 Module AC Output

Paralleling Cabinet

Ph A, B, C- UPS Output

 

 

 

 

D1-D4

UPS #1-UPS #4 Module AC Output

Paralleling Cabinet

Neutral - UPS Output

 

 

 

 

E1-E4

Paralleling Cabinet

UPS #1-UPS #4 Module AC Ground

Ground-UPS

 

 

 

 

F

Paralleling Cabinet

Load AC Connection

Ph A, B, C - Load

 

 

 

 

G

Paralleling Cabinet

Load AC Connection

Ground-Load

 

 

 

 

H

Paralleling Cabinet

Load AC Connection

Neutral-Load

 

 

 

 

I1-I4

Paralleling Cabinet

UPS #1-UPS #4 Module

Output Breaker Aux Contact

 

Parallel Logic Board (M3)

 

 

 

 