Emerson 208V, 10-30kVA installation manual Installation Drawings

Models: 10-30kVA 208V

1 80
Download 80 pages 38.9 Kb
Page 61
Image 61
Manual background

Installation Drawings

Figure 42 Lineup detail—1+N Type C connection to NX

1 + N Cabinet Side View

1 + N Parallel Cabinet

1 + N Cabinet Interior View

(without side panel or door)

(front view without front door and panel)

(neutral and ground busbar location)

UPS Module Left Side View

(without side panel)

1.All Liebert-supplied cable must be repositioned prior to and while setting the cabinets in their installed location.

2.All interconnection cables and hardware supplied by others.

3.AC connections must be made to the UPS modules before attaching paralleling cabinet to UPS modules.

4.Utility AC source neutral not required for maintenance bypass/ transformer cabinet Type C.

5.The interconnecting input cables between the paralleling cabinet and the UPSes must be the same size and the same length.

6.The interconnecting output cables between the paralleling cabinet and the UPSes must be the same size and the same length.

7.The location of the system output neutral busbar (connection K) and the ground busbar (connections H, I and J) are shown for a left-access style. For right-access version, these busbars are at opposite locations.

8.Refer to the individual drawing of each piece of equipment for additional details.

Table 24 Interconnect wiring—1+N Type C connection to NX

Run

From

To

Conductors

 

 

 

 

A

Utility AC Source

Paralleling Cabinet

Ph A, B, C-system Input

 

 

 

 

B

Utility AC Source

Paralleling Cabinet

Ground - System Input

C1-C4

Paralleling Cabinet

UPS #1-UPS #4 Module AC Input

Ph A ,B, C - UPS Input

 

 

 

 

D1-d4

Paralleling Cabinet

UPS #1-UPS #4 Module AC Input

Neutral - UPS Input

 

 

 

 

E1-E4

UPS #1-UPS #4 Module AC Output

Paralleling Cabinet

Ph A, B, C - UPS Output

G1-G4

UPS #1-UPS #4 Module AC Output

Paralleling Cabinet

Neutral - UPS Output

 

 

 

 

H1-H4

Paralleling Cabinet

UPS #1-UPS #4 Module AC Ground

Ground - UPS

 

 

 

 

I

Paralleling Cabinet

Load AC Connection

Ph A ,B, C - Load

J

Paralleling Cabinet

Load AC Connection

Ground - Load

 

 

 

 

K

Paralleling Cabinet

Load AC Connection

Neutral - Load

 

 

 

 

L1-l4

Paralleling Cabinet

UPS #1-UPS #4 Module

Output Breaker Aux Contact

 

UPS Parallel Logic Board (M3)

 

 

 

 

M1-M4

Paralleling Cabinet

UPS #1-UPS #4 Module

Rotary Switch Aux Contact

 

UPS Parallel Logic Board (M3)

 

 

 

 

55

Page 61
Image 61
Emerson 208V, 10-30kVA installation manual Installation Drawings