Emerson 208V, 10-30kVA installation manual 2.3Dry Contacts, 2.3.1Input Dry Contacts

Models: 10-30kVA 208V

1 80
Download 80 pages 38.9 Kb
Page 21
Image 21
2.3Dry Contacts

Electrical Connections

Figure 7 Auxiliary terminal block detail (Monitoring Board)

J8

J3J1

LCD

J2

 

 

 

 

 

 

Intellislot 2

J13

J21 J25

J28

J4

J26 J30

J10

Intellislot 1

BFP

INV ACF

EPO

Dry in

MBC

BCB

Intellislot 3

 

 

X1

X2

 

X3

 

 

 

 

 

 

 

J22

J23

J12

J9

J15

J16

J17

X4

J24

X7

X6

PWR

 

MODEM

X5

SNMP CARD

X4

NOTE: The black square ( ) on each slot indicates Pin 1.

2.3Dry Contacts

The UPS provides input dry contacts and output dry contacts.

2.3.1Input Dry Contacts

There are several input dry contacts at the X3 slot.

Figure 8 Input dry contacts

 

 

NOTE: The black square ( ) on each slot indicates Pin 1.

Table 1

Input dry contacts at X3

 

 

 

 

Position

Name

Description

 

 

 

 

 

J4.1

ENV3

Battery Room Alarm (N.C.)

 

J4.2

BtG

Battery Ground Fault Detection (N.C.)

 

 

 

 

 

J4.3

GEN1,2

Generator Join Detection (N.O.)

 

J4.4

+12V

+12V Power

 

 

 

 

 

1 - Must be configured by configuration software before becoming active.

2 - When activated, the charger current can be limited, via software, to a percentage of the full charger current (0-100%). 3 - Activating this feature turns the battery charger off.

15

Page 21
Image 21
Emerson 208V, 10-30kVA installation manual 2.3Dry Contacts, 2.3.1Input Dry Contacts