Emerson 10-30kVA, 208V installation manual Installation Drawings

Models: 10-30kVA 208V

1 80
Download 80 pages 38.9 Kb
Page 60
Image 60
Manual background

Installation Drawings

Figure 41 Lineup detail—1+N Type B1 connection to NX

1 + N Cabinet Side View

1 + N Parallel Cabinet

1 + N Cabinet Interior View

(without side panel or door)

(front view without front door and panel)

(neutral and ground busbar location)

UPS Module Left Side View

(without side panel)

1.All Liebert-supplied cable must be repositioned prior to and while setting the cabinets in their installed location.

2.All interconnection cables and hardware supplied by others.

3.AC connections must be made to the UPS modules before attaching paralleling cabinet to UPS modules.

4.The interconnecting input cables between the paralleling cabinet and the UPSes must be the same size and the same length.

5.The interconnecting output cables between the paralleling cabinet and the UPSes must be the same size and the same length.

6.The location of the system output neutral busbar (connection K) and the ground busbar (connections H, I and J) are shown for a left-access style. For right-access version, these busbars are at opposite locations.

7.Refer to the individual drawing of each piece of equipment for additional details.

Table 23 Interconnect wiring—1+N Type B1 connection to NX

Run

From

To

Conductors

A

Utility AC Source

Paralleling Cabinet

Ph A, B, C - System Input

B

Utility AC Source

Paralleling Cabinet

Ground - System Input

C

Utility AC Source

Paralleling Cabinet

Neutral -system Input

D1-D4

Paralleling Cabinet

UPS #1-UPS #4 Module AC Input

Ph A, B, C - UPS Input

E1-E4

Paralleling Cabinet

UPS #1-UPS #4 Module AC Input

Neutral - UPS Input

F1-F4

UPS #1-UPS #4 Module AC Output

Paralleling Cabinet

Ph A, B, C - UPS Output

G1-G4

UPS #1-UPS #4 Module AC Output

Paralleling Cabinet

Neutral - UPS Output

H1-H4

Paralleling Cabinet

UPS #1-UPS #4 Module AC Ground

Ground-UPS

I

Paralleling Cabinet

Load AC Connection

Ph A, B, C - Load

J

Paralleling Cabinet

Load AC Connection

Ground-load

K

Paralleling Cabinet

Load AC Connection

Neutral-Load

L1-L4

Paralleling Cabinet

UPS #1-UPS #4 Module

Output Breaker Aux Contact

 

UPS Parallel Logic Board (M3)

 

 

 

 

M1-M4

Paralleling Cabinet

UPS #1-UPS #4 Module

Rotary Switch Aux Contact

 

UPS Parallel Logic Board (M3)

 

 

 

 

54

Page 60
Image 60
Emerson 10-30kVA, 208V installation manual Installation Drawings