Emerson 10-30kVA, 208V installation manual Cable connections

Models: 10-30kVA 208V

1 80
Download 80 pages 38.9 Kb
Page 50
Image 50
Figure 31 Cable connections

Installation Drawings

Figure 31 Cable connections

AC output cable connections

Bypass AC input cable connections

Input Neutral Bus (side view)

Input/Output

Output Neutral Bus

Neutral

(side view)

Earth

Power Earth

 

(side view)

 

Battery connections (+ N -)

 

4.1 to battery

 

4.2 to external battery cabinet

NOTES

1.All dimensions are millimeters.

2.Top and bottom cable entry available through removable access plates. Remove, punch to accommodate conduit size and replace.

3.Control wiring and power wiring must be run in separate conduit. Output and input cables must be run in separate conduit.

4.Aluminum and copper-clad aluminum cables are not recommended,

5.All wiring is to be in accordance with national and local electrical codes.

44

Page 50
Image 50
Emerson 10-30kVA, 208V installation manual Cable connections