Emerson ITR manual Comprehensive Monitoring Solutions, Installation of Environmental Control Units

Models: ITR

1 74
Download 74 pages 51.84 Kb
Page 72
Image 72

Electrical Data

2.5Comprehensive Monitoring Solutions

(For detailed Guide Specifications on these products, refer to information posted at www.liebert.com)

Liebert SiteScan Web System

Liebert SiteLink Module

Liebert Nform

Liebert IntelliSlot Web/485 Card With Adapter and Liebert IntelliSlot 485 Card With Adapter

Environmental Discrete Outputs Card (ENV-DO)

Remote Contact Monitor

RCM4

Autochangeover Controllers

AC3

RAC2-8

Universal Monitor

Leak Detection

Direct Read Module

Zone Sensor

Spot Sensor

3.0EXECUTION

3.1Installation of Environmental Control Units

3.1.1General

Install environmental control units in accordance with manufacturer’s installation instructions. Install units plumb and level, firmly anchored in locations indicated, and maintain manufacturer’s recommended clearances.

3.1.2Electrical Wiring

Install and connect electrical devices furnished by manufacturer but not specified to be factory mounted. Furnish copy of manufacturer’s electrical connection diagram submittal to electrical con- tractor.

3.1.3Piping Connections

Install and connect devices furnished by manufacturer but not specified to be factory mounted. Fur- nish copy of manufacturer’s piping connection diagram submittal to piping contractor.

3.1.4Supply and Drain Water Piping

Connect water supply and drains to air conditioning unit. Provide pitch and trap as manufacturer’s instructions and local codes require.

3.2Field Quality Control

Start up environmental control units in accordance with manufacturer’s start up instructions. Test controls and demonstrate compliance with requirements.

64

Page 72
Image 72
Emerson ITR manual Comprehensive Monitoring Solutions, Installation of Environmental Control Units, Field Quality Control