Table 5-1. Maintenance/Service Schedule

VSG/VSSG • Installation, Operation and Maintenance Manual •Vilter/Emerson • 35391SSG

5 – 1

 

 

 

 

Table 5-1. Maintenance/Service Schedule

 

 

 

 

 

 

 

 

 

 

Follow this table formaintainingand

MaintenanceandService

 

 

 

 

 

 

 

 

 

 

 

 

 

Oil sampling is recommended every 2 to 3 months for the first year. Thereafter,45,000

as required,55,000

increase60,000

 

 

 

 

 

 

 

 

 

 

Service Interval (Hours) (¹)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(Based on dry clean gas)

 

 

 

 

 

 

 

 

 

Group

 

Inspection/

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Maintenance (2)

200

2,500

5,000

10,000

15,000

20,000

25,000

30,000

35,000

 

40,000

 

 

50,000

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Oil Change

 

Replace oil based on oil analysis report or visual contamination.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

servicingthe

Schedule

 

 

Oil Analysis

 

sampling time period if contamination of oil is unlikely or decrease sampling time period if contami-

Oil Circuit

 

nation of oil is evident. Take an oil sample any time during operation If there’s reason to believe that

 

 

 

 

 

 

 

 

 

 

 

 

the oil is contaminated. For additional information on oil, refer to Oil and Oil Flow operation.

 

 

 

 

 

 

Oil Filters (3)

 

-

-

-

-

R

 

-

-

R

-

 

-

 

R

-

-

 

R

 

 

 

 

Oil Strainer

 

I

I

I

I

I

 

I

I

I

I

 

I

 

I

I

I

 

I

compressor

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Coalescing Filter

 

-

-

-

-

R

 

-

-

R

-

 

-

 

R

-

-

 

R

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Coalescing Drain Line

 

I

I

I

I

I

 

I

I

I

I

 

I

 

I

I

I

 

I

 

 

Compressor

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Suction Screen

 

I

-

-

I

-

 

I

-

I

-

 

I

 

-

I

-

 

I

unit

 

Unit

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Coupling Alignment

 

I

I

I

I

I

 

I

I

I

I

 

I

 

I

I

I

 

I

 

 

 

 

 

 

at

 

 

 

and Integrity

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

hourly

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Motor (Compressor)

 

See Motor Manual for proper lubrication procedures and service intervals.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Transducers

 

I

I

I

I

I

 

I

I

I

I

 

I

 

I

I

I

 

I

intervals.

 

Control

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

RTDs

 

I

I

I

I

I

 

I

I

I

I

 

I

 

I

I

I

 

I

 

 

Calibration

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Slide Valve Motors

 

Slide

valve

calibration should be inspected monthly. Inspections can be performed through the

 

 

 

 

 

control panel. If a Non-Movement Alarm appears, calibrate immediately.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Compressor (4) (5)

Compressor (6)

 

-

I

-

I

-

 

I

-

I

-

 

I

 

-

I

-

 

I

 

 

Bearings

 

-

-

-

-

-

 

-

-

-

-

 

-

 

-

-

-

 

I

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

I = Inspect

S = Sampling

R = Replace

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(1)Vilter recommends that a Preventative Maintenance Program be developed by Vilter GC (Gas Compression) Service Center.

(2)Daily records should be kept on suction, discharge, oil pressures & temperatures, along with ensuring Temp Leaving Oil Separator is above Dew Point.

(3)Replace oil filters when pressure drop reaches 7 PSID (maximum allowable pressure drop is 15 PSID).

(4)The life of the compressor will be increased by purging the compressor unit with dry nitrogen or sweet, dry natural gas at shutdown.

(5)Header drains should periodically be drained for liquid build-up to prevent compressor damage, see Piping in Section 3.

(6)Inspections include: gate rotor inspection, backlash measurement, shelf clearance, end play measurement (main rotor & gate rotor), gate rotor float, slide valve inspection.

Section 5 • Maintenance/Service

Page 59
Image 59
Emerson VSG, VSSG manual 1. Maintenance/Service Schedule, Oil Circuit, Unit, Control, Calibration