Emerson VSG, VSSG manual Leveling and Grouting, Installation

Models: VSG

1 106
Download 106 pages 24.52 Kb
Page 27
Image 27
Leveling and Grouting

Section 3 • Installation

Leveling and Grouting

recommendations for setting, precautions, mixing, and

The unit should be level in all directions. Wet the

grout placement, finishing and curing. The grout must

be worked under all areas of the feet with no bubbles or

concrete pad according to the grout manufacturer’s

voids. If the grout is settled with a slight outside slope,

directions. Mix a sufficient amount of grout. The grout

oil and water can run off of the base. Once the grout has

must be an expanding grout rather than shrinking to

cured, torque the anchor bolts as per HILTI instructions.

provide a tighter bond. Follow the manufacturer’s

 

G.A.

G.A.

COMPRESSOR UNIT

CENTER LINE OF

GAS COMPRESSION

SYSTEM

EL. TOP OF

GRADE

6"

# 6 @ 12"

EACH WAY TOP & BOTTOM

EXCAVATE TO FROST DEPTH AS REQ'D AND BACKFILL

WITH CLSM OR NON-FROST SUSCEPTIBLE FILL

Figure 3-3. Concrete Pad with Compressor Unit Dimensions - Front View

 

 

 

 

 

 

ISOLATION JOINT,

 

 

 

 

 

 

 

 

 

 

 

 

1" MINIMUM

COMPRESSOR UNIT

 

CHAMFER EDGE

 

 

 

THICKNESS

 

 

 

FOUNDATION

 

 

 

 

 

 

CONCRETE

SLAB IN

6” BUILDING

Figure 3-4. Interior Foundation Isolation

VSG/VSSG • Installation, Operation and Maintenance Manual •Vilter/Emerson • 35391SSG

3 – 7

Page 27
Image 27
Emerson VSG, VSSG manual Leveling and Grouting, Installation, recommendations for setting, precautions, mixing, and