Piping

The ideal load applied to flanges of the compressor unit is zero. However, it’s not practical to expect that no loads will be applied to unit connections. Thermal, dead, live, wind & seismic loads must be considered and even toler- ated. Well supported external piping connected to the compressor will still result in some loads applying forces and moments in three axes to unit flanges.

The most important issue is the motor-compressor mis- alignment caused by external forces (F in lbf) and mo- ments (M in ft-lbf) imposed by plant piping. In Figure 3-9 and Table 3-2, are the maximum allowable forces and moments that can be applied to compressor flanges when the compressor is mounted on an oil separator.

It must be noted that it is necessary to check for com- pressor shaft movement when the job is complete. In no case shall the attached piping be allowed to cause more than 0.002” movement at the compressor shaft. If more than 0.002” movement is detected the piping must be adjusted to reduce the compressor shaft move- ment to less than 0.002”. For example, the compressor shaft should not move more than 0.002” when piping is removed or connected to the compressor.

IMPORTANT – piping elements shall be supported per the requirements of ASME B31.5 / B31.3 as applicable. See guidelines below, particularly with concern to mini- mizing loads on check valves.

Header Piping and Drains

Header drains should also be installed to allow drainage of liquids from the discharge and suction headers. See Appendices for Recommended Header Piping.

CAUTION

Accumulated liquid in the suction header can damage the compressor if not drained. Always drain headers (suction and discharge headers) prior to start-ups. Failure to comply may result in damage to equipment.

Remote Air Cooled Oil Cooler Piping

If equipped with a remote air cooled oil cooler, it is im- portant that the piping be installed correctly to and from the compressor unit and remote air cooled oil cooler. See Appendices for Recommended Air Cooled Oil Cooler Piping.

3 – 10

VSG/VSSG • Installation, Operation and Maintenance Manual •Vilter/Emerson • 35391SSG

Page 30
Image 30
Emerson VSSG, VSG manual Piping, Installation, 010Ä5*4+0- 214176 4%1//0&& 14 175-2+0 10%46 $#5