Enterasys Networks 6H303-48, 4G4282-49, 9034096-02 manual Unpacking the DFE-Gold Module

Models: 6H303-48 4G4282-49 9034096-02

1 90
Download 90 pages 21.45 Kb
Page 34
Image 34

Unpacking the DFE-Gold Module

For information about...

Refer to page...

 

 

Completing the Installation

3-29

 

 

Unpacking the DFE-Gold Module

Unpack the DFE‐Gold module as follows:

1.Open the box and remove the packing material protecting the DFE‐Gold module.

2.Verify the contents of the carton as listed in Table 3‐1.

Table 3-1 Contents of DFE-Gold Module Carton

Item

Quantity

 

 

DFE-Gold module (4G4202-72 or 4G4282-49)

1

 

 

This Installation Guide

1

 

 

Customer Release Notes

1

 

 

3.Remove the tape seal on the non‐conductive bag to remove the DFE module.

4.Perform a visual inspection of the DFE‐Gold module for any signs of physical damage. Contact Enterasys Networks if there are any signs of damage. Refer to “Getting Help” on page 1‐8 for details.

Installing Optional Network Expansion Modules

Note: Install any optional equipment before proceeding to “Module Placement and Rules” on page 3-9 for an explanation of the rules to install different series modules in a Matrix E7 chassis.

Installing a network expansion module involves

removing the coverplate from the DFE‐Gold module,

attaching the network expansion module to the DFE‐Gold module, and

if required, installing the Mini‐GBICs.

Caution: An antistatic wrist strap is required to perform the following procedures to minimize ESD damage to the devices involved.

Precaución: Para minimizar los efectos de las descargas de electricidad estática, deberá utilizar una pulsera antiestática al realizar los siguiente procedimientos.

3-2 Installation

Page 34
Image 34
Enterasys Networks 6H303-48, 4G4282-49 manual Unpacking the DFE-Gold Module, Installing Optional Network Expansion Modules