Installation, cont’d

Figure 2-8below shows an example of a view of a vectorscope during adjustment of the color subcarrier phase (SC/H). The subcarrier phase should be aligned to 0º (indicated in the figure by the triangle).

350

0

10

340

 

20

330

 

30

A1+40

320

 

40

 

310

 

50

 

300

 

60

A2

290

 

70

 

 

 

280

 

80

A3

270

 

90

 

 

 

260

 

100

B1

250

 

110

 

 

 

240

 

120

B2

230

 

130

-40

220

 

140

B3

210

 

150

200

 

160

 

190

180

170

Figure 2-8 — Vectorscope screen during color subcarrier phase adjustment

2-10 MVP 104GX Installation

Page 18
Image 18
Extron electronic MVP 104GX manual Vectorscope screen during color subcarrier phase adjustment