Front Panel Operations

The following paragraphs detail the power-up process and then provide sample procedures for the following actions:

Creating ties, sets of ties, and configurations

Changing a configuration

Viewing ties, sets of ties, and configurations

Muting and unmuting outputs

Saving a preset

Recalling a preset

Viewing and adjusting the output volume

Viewing and adjusting the input audio level

Locking the front panel

Performing front panel resets

Reading and setting the RS-232/RS-422 Remote port settings

Power

Apply power by connecting the power cord to an AC source. When AC power is applied, the switcher performs a self-test that flashes the front panel LEDs and then turns them off. An error-free power up self-test sequence leaves the RGBHV LED and the Audio LED on, and all other LEDs unlit.

The current configuration and all presets are saved in non-volatile memory. When power is applied, the most recent configuration is retrieved. The previous presets remain intact.

If an error occurs during the self-test, the switcher locks up and does not operate. If your switcher locks up on power-up, call the Extron S3 Sales & Technical Support Hotline.

MVX 128 A VGA Matrix Switchers • Operation 3-7

Page 25
Image 25
Extron electronic MVX 128 manual Front Panel Operations, Power