Operation and Maintenance
Operator needs to replace following parts. It is recommended to use abrasion counter on the operator panel and schedule the replacement of parts. Parts to be replacement cycle are as follows.
The parts replacement procedures are described in the Operator’s Guide.
|
| Table 5.6 | Parts replacement |
|
No | Part name | Part number | Replacement cycle | Remarks |
|
|
|
|
|
1 | Pad ASY | Every 100,000 sheets or | One per scanner | |
|
|
| annually *1 |
|
|
|
|
|
|
2 | Pick roller | Every 200,000 sheets or | One set per scanner | |
|
|
| annually *1 | (two rollers are in one |
|
|
|
| |
|
|
|
| set) |
|
|
|
|
|
*1 These replacement cycle may be shortened depending on the paper scanned and bad scanner cleaning. When