Fujitsu Siemens Computers X103 SFF manual Preparing for use, Unpacking and checking the delivery

Models: X103 SFF

1 49
Download 49 pages 30.42 Kb
Page 13
Image 13
Preparing for use

Preparing for use

!Please take note of the safety information in the "Important notes" chapter.

Unpacking and checking the delivery

It is recommended not to throw away the original packaging material! It may be required for reshipment at some later date.

Unpack all the individual parts.

Check the delivery for damage incurred during transportation.

Check whether the delivery agrees with the details in the delivery note.

Should you discover that the delivery does not correspond to the delivery note, notify your local sales outlet immediately.

Steps for initial setup

Only a few steps are necessary to put your new device into operation for the first time:

Select location for device and set up device

Connect the monitor, mouse and keyboard

Check the voltage at the mains outlet and connect the device to an electrical outlet

Switching the device on

You will learn more about the individual steps in the following sections.

i

External devices

If you have received other devices in addition to your device (e.g. a printer or a modem),

 

do not connect these until after the initial installation. The following sections contain a

 

description of how to connect these external devices.

Drives and boards

If you have received drives or boards with your device, please do not install them until after first-time setup. How to install drives and boards is described in the "System expansions" chapter.

VFY-SCED103S, edition 1

5

Page 13
Image 13
Fujitsu Siemens Computers X103 SFF manual Preparing for use, Unpacking and checking the delivery, Steps for initial setup