2. WIRING

(inside the shield cover)

TB101 TB102

 

 

 

TB3

 

 

 

 

 

 

1 5

 

 

 

TB1

 

 

1 4

 

 

 

 

 

1 3

 

 

 

1 1

 

 

1 2

 

 

 

 

 

1 1

 

 

 

1 0

 

 

1 0

 

 

TB5

9

TB2

9

 

 

8

8

TB4

7

7

 

6

7

6

 

6

 

5

6

5

 

5

5

 

5

4

 

4

4

 

4

4

3

 

3

3

 

3

3

2

 

2

2

 

2

2

1

 

1

1

 

1

1

 

 

TB8

 

TB10

 

 

 

1 4 TB9

 

 

 

1 3

 

 

 

TB7

1 3

1 2

 

 

TB6

1 2

1 2

 

 

1 0

1 1

1 1

1 1

TB11

9

1 0

1 0

1 0

9

9

9

9

 

8

8

8

8

8

8

 

7

7

7

7

7

 

7

6

6

6

6

6

 

6

5

5

5

5

5

 

5

4

4

4

4

4

 

4

3

3

3

3

3

 

3

2

2

2

2

2

 

2

1

1

1

1

1

 

1

IV-2 sq.

DPYCY-2.5 (Power)

 

 

(Power for DS-620)

(LOGOUTPUT)

DPYCY-4

 

 

 

DPYC-1.5

TTYCY-4S (DS-620/640)

TTYCS-1 (IEC61162 IN) TTYCS-1Q

(Analog meter) TTYCS-4 (Main display) TTYCS-1 (Analog OUT)

 

 

 

 

Cable clamps

 

 

 

 

(two sets)

 

 

 

 

Earth plates (two sets):

 

TTYCS-1 (IEC61162 OUT)

 

 

Fix each shield of cables

TTYC-7S (ALARM)

TTYCS-1 (KP IN/OUT) TTYCS-4/TTYCYS-4 (Sub display)

TTYCS-4/TTYCYS-4 (Sub display)

here.

CO-SPEVV-SB-C 0.2x5P (Rate-of-turn gyro DS-340)

2-3

Page 31
Image 31
Furuno DS-60 installation manual TB3 TB1 TB5 TB2 TB4 TB8