How to lift scanner unit

1.Fix the scanner radiator to the scanner unit chassis.

2.Attach the lifting fixtures and collars as shown in Figure 1-2 and 1-3.

.

3. Position the radiator as shown in Figure 1-3 and arrange the ropes A=. 2m

.

and B=. 1.8m.

Lifting fixture

 

Supplied as installation

Collar for fixing

materials. Remove after

installation.

Spring washe

r (M12)

Hex bolt (M12X20)

Remove lifting fixture, coat threads of hex bolts with silicone grease, and then insert bolts in scanner body.

Lifting hook (2 pcs.)

Figure 1-2 Attachment of lifting fixtures and collar

.* A=2. .0m

.

B=1. .8m

*

* Protect radiator with cardboard or cloth at locations marked with asterisk.

Figure 1-3 Attachment of ropes

1-3

Page 11
Image 11
Furuno FR-2135S manual How to lift scanner unit, Attachment of lifting fixtures and collar