2.Carefully thread the ribbon cables through the openings in the chassis and connect them to the appropriate connectors. See Figure 7 on page 12 for the locations of the connector on the system board and see the RAID Cage Configuration Guide for the location of the connector on the RAID bay backplane.

3.Secure the bezel with the screws you removed when removing the bezel.

Reinstalling the wrap-around panel

You must replace the bezel before you replace the wrap-around panel. You must replace the wrap-around panel before you replace the side panel.

To Replace the Wrap-around Panel

1.Hold the wrap-around panel at a slight angle over the chassis as shown in Figure 5.

Figure 5: Reinstalling the Wrap-Around Panel

8 Maintaining and Troubleshooting the Gateway ALR 8300 Server