Generac Power Systems 7 kW NG, 10 kW LP, 13 kW NG, 9 kW NG, 8 kW LP, 17 kW LP Operational Analysis

Models: 18 kW NG 14 kW LP 16 kW NG 20 kW LP 17 kW LP 8 kW LP 9 kW NG 7 kW NG 13 kW NG 10 kW LP

1 192
Download 192 pages 31.78 Kb
Page 62
Image 62

Section 3.2

Operational analysis

Part 3

Transfer switch

Operational Analysis

Figure 1 is a schematic for a typical “W/V-Type” transfer switch.

 

 

 

 

 

 

 

0

 

0

0

 

 

 

 

 

 

 

E1

 

 

 

15B

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

15B

 

15B

15B

CONTROL

 

 

 

 

 

 

N1A

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TRANSFER

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

7

7

9

9

A

23

 

23

23

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

E1

TR1

 

 

 

 

 

 

 

 

 

 

1

4

3

6

 

 

 

 

 

 

TS TO

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

23 B

 

 

 

 

 

 

GENERATOR

 

 

 

N1A

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

F2

 

 

 

 

CONTROL PANEL

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

126

 

205

 

 

 

N2

N2

UTILITY

 

 

 

 

 

 

 

 

N2A

 

 

 

SENSING

 

 

 

 

 

 

 

 

 

 

 

 

F1

 

 

 

 

 

 

 

 

 

 

 

 

 

 

240VAC

 

 

 

 

 

 

 

N1A

 

 

 

N1A

N1

N1

OUTPUT

 

 

 

 

-

+

 

 

 

 

 

N1A

 

 

 

 

 

 

 

 

BLK

RED

 

 

 

 

 

 

E1

BLACK

 

 

 

 

 

 

 

 

 

 

E1

 

 

 

 

 

 

WIRE

WIRE

 

 

 

 

 

 

 

 

 

 

 

 

BC

 

 

 

 

 

 

 

E2

RED

 

TO GENERATOR

 

 

 

 

 

 

 

 

E1

 

NEUTRAL (WHITE)

OUTPUT

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

E2

NEUTRAL

GROUND (GREEN)

 

 

 

 

 

 

 

 

 

 

 

 

 

CONNECTION

 

 

 

 

 

 

 

 

B

 

 

 

 

 

 

INSIDE

GROUND (GREEN)

 

 

 

 

 

 

 

 

 

 

 

 

SWITCH

 

 

 

 

 

 

 

 

 

 

 

N2A

 

 

NEUTRAL (WHITE)

240VAC TO

 

 

 

 

 

 

 

B 205

 

 

 

RED (MAIN 2)

 

 

 

 

 

 

 

 

 

 

PANEL

 

 

 

 

 

 

 

 

 

 

 

 

 

 

MAIN DISTRIBUTION

 

 

 

 

126

 

N2A

N1A

 

 

BLACK (MAIN 1)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

E1

 

CIRCUIT 14

 

 

 

 

 

 

 

 

NO

 

NC

NC

NO

 

E2

 

 

 

 

 

 

 

 

 

SW2

 

SW3

 

E2

CIRCUIT 13

 

 

 

 

 

 

 

 

 

COM

 

COM

 

 

 

 

 

 

 

 

 

 

B

 

 

 

 

 

 

 

CIRCUIT 10

 

 

 

 

 

 

 

N2A

 

VR1

VR2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

A

 

C1

 

C2

 

 

CIRCUIT 9

 

 

 

 

 

 

 

 

 

SW1

 

T1 T1 T2

 

CIRCUIT 6

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

N2A

 

 

 

 

 

CIRCUIT 5

 

CENTER

CENTER

CENTER

CENTER

CENTER

 

 

 

 

 

 

 

 

 

 

 

F3

 

 

B

E2

 

 

CIRCUIT 2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

T1

 

 

 

 

T1

CIRCUIT 1

 

LOAD

LOAD

LOAD

LOAD

LOAD

 

 

 

 

 

 

 

 

T2

CIRCUIT 3

 

 

 

 

 

 

 

 

 

 

CIRCUIT

CIRCUIT

CIRCUIT

CIRCUIT

CIRCUIT

 

 

B

 

 

 

 

E2

 

CIRCUIT 4

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CIRCUIT 7

 

8

10

12

14

16

 

 

 

 

 

 

 

 

 

 

 

LEGEND

CIRCUIT 8

BC-BATTERY CHARGER

 

C1-UTILITY COIL & RECTIFIER

CIRCUIT 11

C2-GENERATOR COIL & RECTIFIER

 

F1,F2,F3-5A, 600V FUSE

CIRCUIT 12

LC-CIRCUIT BREAKER (LOADS)

 

(16 CIRCUIT SHOWN FOR REFERENCE ONLY)

CIRCUIT 15

N-NEUTRAL

 

SW1-AUTOMATIC TRANSFER SWITCH

CIRCUIT 16

SW2,SW3-LIMIT SWITCHES

LC

TB1-TERMINAL STRIP

 

TR1-TRANSFER RELAY

Figure 1. Schematic

Page 60

Page 62
Image 62
Generac Power Systems 7 kW NG, 10 kW LP manual Operational Analysis, Is a schematic for a typical W/V-Type transfer switch