Section 4.2

Operational analysis

Part 4

DC control

Utility Voltage Dropout and Engine Cranking

After ten (10) seconds and when the circuit board’s 10-second timer has timed out, if utility voltage is still below

65 percent of nominal, circuit board action will energize the circuit board’s crank and run relays simultaneously.

Printed circuit board action delivers 12 volts DC to a starter contactor relay (SCR), via Wire 56. When the SCR energizes, its contacts close and battery power is delivered to a starter contactor (SC). When the SC energizes, its contacts close and battery power is delivered to the starter motor (SM). The engine cranks.

 

 

POWER

 

 

WINDING

 

 

44

6

STATOR

22 33

2

 

11

 

 

POWER

 

WINDING

BA

0

4

IM2

18

SP2

 

IM1

18

SP1

 

2

 

2

 

6

 

6

 

0

0

0

VOLTAGE

4

4

REGULATOR

4

22

22

 

 

 

11

 

11

 

0 4

8586

HTO LOP

56

00

SCR

0

0

 

13

 

13

 

13

13

BATTERY

 

 

 

12V

SCR

0

 

16

SC

 

SM

Page 108

Page 110
Image 110
Generac Power Systems 10 kW LP, 13 kW NG, 7 kW NG, 9 kW NG, 8 kW LP, 17 kW LP manual Utility Voltage Dropout and Engine Cranking