Heat & Glo LifeStyle 6000TR Step Framing the Fireplace, Minimum Clearances from the Vent Pipe to

Models: 6000TR 6000XLT-CDN 6000XLS 6000ARCH

1 48
Download 48 pages 45.62 Kb
Page 9
Image 9
Minimum Clearances from the Vent Pipe to

Minimum Clearances from the Vent Pipe to

Combustible Materials

 

 

 

For Vertical

 

 

 

 

For Horizontal Sections

Sections

At Wall Firestops

 

 

 

 

 

 

 

 

Top

Bottom

Sides

 

Top

Bottom

Sides

 

 

 

 

 

 

 

 

3 inches

1 inch

1 inch

1 inch

2-1/2 inches

1/2 inch

1 inch

(75 mm)

(25 mm)

(25 mm)

(25 mm)

(63.7 mm)

(13 mm)

(25 mm)

 

 

 

 

 

 

 

 

Step 2

Framing the

Fireplace

For minimum clearances, see the direct vent termination clearance diagrams on pages 28 and 30 in this manual.

Fireplace framing can be built before or after the fireplace is set in place. Framing should be positioned to accommodate wall coverings and fireplace facing material. The diagram below shows framing reference dimensions.

CAUTION

MEASURE FIREPLACE DIMENSIONS, AND

 

VERIFY FRAMING METHODS AND WALL

 

COVERING DETAILS, BEFORE FRAMING

 

CONSTRUCTION BEGINS.

SHOWS CENTER OF12" X 12"

 

VENT FRAMING HOLES FOR

 

TOP & REAR VENTING.

 

 

 

 

 

B

 

 

 

 

 

 

C

 

 

Framing should be

A

 

 

 

 

 

E D

 

constructed of 2 X 4

 

 

 

 

lumber or heavier.

 

 

Model

A

B

C

D

E

6000TR

42

38 1/4

22

42

26 1/4

6000XLS

42

38 1/4

22

N/A

26 1/4

6000XLT-CDN

42

38 1/4

22

42

N/A

6000ARCH

42*

41 7/8

22

53 5/8

N/A

 

48 1/4**

 

 

 

* SURROUND IN FRONT OF FINISHED WALL

 

 

 

** SURROUND FLUSH WITH FINISHED WALL

 

 

 

NOTE: DIMENSIONS SHOWN IN INCHES

 

 

 

Figure 4. Framing Dimensions

 

 

 

9

 

 

 

 

Page 9
Image 9
Heat & Glo LifeStyle 6000TR Step Framing the Fireplace, Minimum Clearances from the Vent Pipe to, Combustible Materials