Hoshizaki dcm-75ibah Control Board Sequence Flow Chart DCM-751BH-OS, Operation, Diagnosis

Models: dcm-75ibah

1 61
Download 61 pages 51.24 Kb
Page 12
Image 12

"F-A" Control Board Sequence Flow Chart

DCM-751B_H(-OS)

4. 1-in-12 Drain Cycle - Although the factory default 1-in-1 drain cycle is recommended, a 1-in-12 drain cycle is available. For 1-in-12 drain cycle sequence, see "3. 1-in-12 Drain Cycle & Restart (optional)."

A. Sequence of

II. Sequence of

1. Startup

Power Switch "ON" Control Switch in "ICE" Safety Switch closed "POWER OK" LED on

1. Fill Cycle

Maximum

90 seconds

2. Ice Purge Cycle

To bypass, press the "SERVICE" button after GM starts.

5 sec. 5 minutes

3. Freeze Cycle

1-in-1 drain cycle. DV energizes for 2 seconds every hour

(S1 Dip Switch 4).

Refill

Does not affect operation.

Maximum

 

 

90 seconds

Low Water Safety

When UFS closes,

90 sec. FT exceeded

alarm resets and

1-beep alarm sounds

2. Ice Purge Cycle

90 sec. PT starts

starts.

90 seconds

 

 

 

 

 

 

 

FT

PT

terminates

 

exceeded

 

 

 

 

 

 

 

 

 

 

 

 

 

 

OperationFlow

Operation and

 

WV energized

LFS closed

GM energized

Comp energized

UFS open

LFS closed

1-beep alarm sounds

1-beep alarm continues

 

UFS closed

GMPR energized

FM energized

LFS open

UFS closed

PT starts

WV energized

 

FT starts (90 sec.)

 

FT terminates

 

GM energized

FT starts (90 sec.)

FT terminates

UFS open

GM de-energized

 

 

 

 

 

WV de-energized

GMPR energized

WV energized

WV de-energized

WV energized

GMPR de-energized

12

If Fill > 90 sec. FT

 

 

Comp energized

Comp energized

Comp de-energized

 

1-beep alarm sounds

 

 

FM energized

FM energized

FM de-energized

 

 

WV energized

 

 

 

GM energized

GM energized

GM energized

 

 

When UFS closes

 

 

GMPR energized

GMPR energized

GMPR energized

 

 

alarm resets and

 

 

 

 

 

 

2. Ice Purge Cycle starts.

Chart

Service

 

Diagnosis

2.Bin Control Shutdown & Restart

BC open (BC actuator paddle engaged)

1. Bin Full

2. Icemaker Off

3. Icemaker Restart

6 to 10 sec.

 

Ice level lowered

to "2. Ice Purge Cycle" above

All Components de-energizedBC closed

(BC actuator paddle disengaged)

Legend: BC-bin control Comp-compressorDC-drain cycle DT-drain timer DV-drain valve FM-fan motor

3. 1-in-12 Drain Cycle

1. DT Initiates DC 2. Ice Purge Cycle

3. 10-Minute Drain 4. Icemaker Restart

& Restart (optional)

5 minutes

 

to "1. Fill Cycle" above

(S1 dip switch 4)

 

 

 

 

 

Comp de-energized

DV energized

10-min. DT terminates

 

FM de-energized

GM de-energized

DV de-energized

 

GM energized

GMPR de-energized

1-in-12 DT reset

 

GMPR energized

 

 

FT-fill timer (low water safety) GM-gear motor GMPR-gear motor protect relay LFS-lower float switch PT-purge timer

UFS-upper float switch WV-inlet water valve

Page 12
Image 12
Hoshizaki dcm-75ibah service manual Control Board Sequence Flow Chart DCM-751BH-OS, Operation, Diagnosis