Below is an example Power report. Check a node's Present Power, Average Power, Maximum Power, and Minimum Power.

Zeros in power readings indicate that the firmware is not responding to the Power Monitoring module at that time stamp.

IMPORTANT: Power Monitoring is not supported on all Cluster Test server models. For more information, contact HP support.

Excluding the head node from tests

To exempt the head nodes in the current cluster configuration from tests, select Exclude Head Node on the Cluster Test interface.

38 Cluster Test tools