Contents |
|
Planning the installation | 6 |
Verifying the pallet contents | 6 |
Rack requirements | 7 |
8 | |
Warning, caution, and important messages | 8 |
Space and airflow requirements | 10 |
Temperature requirements | 11 |
Power requirements | 11 |
Grounding requirements | 11 |
Component and LED identification | 12 |
Enclosure front components | 12 |
Power supply bay numbering | 13 |
Power supply LEDs | 13 |
Device bay numbering | 14 |
HP BladeSystem Insight Display components | 15 |
Location Discovery Services | 15 |
Enclosure rear components | 16 |
Fan bay numbering | 17 |
Fan LED | 18 |
Onboard Administrator components | 18 |
HP c7000 Onboard Administrator with KVM components | 19 |
Interconnect bay numbering | 20 |
Installation | 21 |
Installation overview | 21 |
Disassembling the enclosure | 21 |
24 | |
Rack installation | 24 |
Measuring with the rack template | 25 |
Installing the rack rails | 25 |
Installing the enclosure into the rack | 26 |
Installing the rear cage into the enclosure | 28 |
Component installation | 29 |
Installing a power supply | 29 |
Installing blades | 31 |
Connecting locally to a server blade with video and USB devices | 40 |
Installing fans | 42 |
Installing Onboard Administrator modules | 44 |
Installing interconnect modules | 46 |
Cabling and powering up the enclosure | 56 |
Cabling the enclosure | 56 |
Onboard Administrator cabling | 56 |
Enclosure link cabling | 57 |
Cabling a PC to the enclosure service port | 58 |
Cabling the network to the enclosure | 59 |
Contents | 3 |