Installing blades
The c7000 enclosure is divided into four quadrants by the vertical support metal work. Within each quadrant, a removable divider supports
CAUTION: Failure to install the divider in a quadrant when installing
Item
1
2
3
4
Description
Blade Zone 1
Blade Zone 2
Blade Zone 3
Blade Zone 4
Storage blades and tape blades can be installed in the same quadrant as both
The lower tape or storage blade cannot be removed without first removing the upper
Installing a full-height blade
The HP BladeSystem c7000 Enclosure ships with four device bay shelves to support
To install a blade: