Each connection is labeled. Two of the conduits power the electrical busway breakers and one powers the house panel.

3.Turn on facility power.

4.Close the three main breakers on the switchboard.

Installation 24

Page 24
Image 24
HP Performance Optimized Data Center (POD) 40cp manual Installation