Husqvarna Automower manual Installation, Lift out the boundary wire

Models: Automower

1 86
Download 86 pages 6.9 Kb
Page 37
Image 37
9.Lift out the boundary wire.

3. Installation

7.Route the guide wire at least 7 ft straight out from the front edge of the charging plate.

If you shall install the guide wire through a passage:

Automower follows the guide wire on the same side of the wire both to and from the charging station. This means that in towards the charging station the guide wire is on the right side of the mower and away from the charging station the guide wire is on the left side of the mower.

In the passage, the guide wire must be placed so that the mower has as much space to run as possible. The distance between the boundary wire and the guide wire must however be at least 12" (see the picture above).

The same minimum distance (12") also applies between the guide wire and the guide wire in the passage,

8.Run the guide wire to the spot on the boundary wire where you want to make the connection.

9.Lift out the boundary wire.

10.Cut off the boundary wire using a pair of wire cutters.

Maximum

distance

At least 12"

At least

7 ft

3012-648

3012-649

Automower from

37

Page 37
Image 37
Husqvarna Automower manual Installation, Lift out the boundary wire