IBM 4986B LanProbe manual

Models: 4986B LanProbe

1 143
Download 143 pages 41.68 Kb
Page 54
Image 54
3.Place LanProbe in the left support shelf slot while aligning the two empty screw holes (from Step 2 on page 33) with the two screw holes in the support shelf. The correct alignment has the front of LanProbe facing out the front of the support shelf, refer to Figure 3-11 on page 35.

Installation

Installing the Probe

3.Place LanProbe in the left support shelf slot while aligning the two empty screw holes (from Step 2 on page 33) with the two screw holes in the support shelf. The correct alignment has the front of LanProbe facing out the front of the support shelf, refer to Figure 3-11 on page 35.

4.Attach LanProbe to the support shelf with two 0.75” #M4 self-tapping POZIDRIVâ screws. Refer to Figure 3-11 on page 35 for the correct alignment.

5.Attach one Dual Lock Reclosable Fasteners‚ strip to the top of LanProbe, being careful to place it in a location that will both allow for the alignment of the power module to be inside the support shelf and to not block the LanProbe vent holes, refer to Figure 3-11 on page 35.

34

Page 54
Image 54
IBM 4986B LanProbe manual