Basics

Starting the Machine

A Press the operation switch.

1

The On indicator lights and the display turns on.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Note

If the machine does not start when the operation switch is pressed, make sure the main power switch is on.

The machine will take up to 360 seconds to warm up during which copying

is not possible. However, you can set up a job during this period with the Auto Start function. See ⇒ P.70 “Auto Start”.

You can set up a copy job and press the {Start}key while the “Select copy mode and press Start. Copying will start after warm up.” message is dis- played.

When “Enter user code, then press # key.” is displayed, enter your user code. See ⇒ P.70 “User Codes”.

Shutting Down the Machine

APress the operation switch. The On indicator goes out.

Turning Off the Main Power

APress the Main Power switch.

The Main Power switch indicator goes out.

Note

If you leave the Main Power switch off for more than 20 days, the date set- ting might be wrong. For how to set the date, see “Timer Settings” in the System Settings manual.

14