Lennox International Inc G61MP Series Units, Gas Units Vent Pipe Sizing Worksheet

Models: G61MP Series Units Gas Units

1 64
Download 64 pages 11.85 Kb
Page 63
Image 63
Vent Pipe Sizing Worksheet

Vent Pipe Sizing Worksheet

Step 1

Proposed vent pipe size : ______

Equivalent Feet

Step 2

Termination kit catalog number : _____________

 

 

Vent pipe equivalency value from table 5 : ______

 

Step 3

Total number of 90° elbows required (indoors and outdoors)

 

 

______ X 5 = ______ equivalent feet of pipe

 

Step 4

Total number of 45° elbows required (indoors and outdoors)

 

 

______ X 2.5 = ______ equivalent feet of pipe

 

Step 5

Linear feet of straight pipe required : ______

 

Step 6

Add equivalent feet of vent pipe listed in

TOTAL

 

steps 2 through 5.

 

 

 

 

 

 

If the total is equal to, or less than, the allowable maximum given in table 6, the proposed pipe size is acceptable. If the total exceeds the maximum allowed vent pipe length, repeat the process above using the next larger diameter pipe until an acceptable total is achieved.

NOTE − In Direct Vent systems, total the equivalent length of either the exhaust OR intake piping run, depending upon which will be LONGER. Intake and exhaust pipe diameter must be the same size and must be terminated in the same pressure zone. Intake and exhaust pipe should be roughly the same length.

G61MP Start−Up & Performance Check List

Job Name

 

Job No.

 

Date

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Job Location

 

 

City

 

 

 

 

State

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Installer

 

 

 

 

 

City

 

 

 

 

State

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Unit Model No.

 

Technician

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Serial No.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Heating Section

Electrical Connections Tight?

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Blower Motor H.P.

 

 

 

 

 

 

 

 

Line Voltage

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Blower Motor Amps

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Gas Piping Connections

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Tight & Leak−Tested?

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Fuel Type: Natural Gas?

 

 

 

 

 

LP/Propane Gas?

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Furnace Btu Input (High fire)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Line Pressure

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Low Fire Manifold Pressure

 

 

 

 

w.c. − Nat.:

 

 

 

 

 

 

 

 

 

 

 

w.c. − LP/Propane

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

High Fire Manifold Pressure

 

 

 

 

w.c. − Nat.:

 

 

 

 

 

 

 

 

 

 

 

w.c. − LP/Propane

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Proper Draft?

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Flue Connections Tight?

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Combustion Gas Tested (high fire and low fire)?

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CO2

 

CO

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Blower ON delay confirmed?

 

 

 

 

 

 

 

 

External Static Pressure?

 

 

 

(45 Seconds Fixed On)

 

 

 

 

 

 

 

 

(0.5 maximum)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Blower OFF Delay Setting (60, 90, 120 or 180)?

 

 

 

 

 

 

 

 

 

 

 

 

Temperature Rise

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Filter Clean & Secure?

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Thermostat

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Heat Anticipator Setting?

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Thermostat Level?

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 63

Page 63
Image 63
Lennox International Inc G61MP Series Units, Gas Units Vent Pipe Sizing Worksheet, G61MP Start−Up & Performance Check List