Lennox International Inc SL280UH070V36A, SL280UH090V48B, SL280UH090V36B Venting, UPFlow Position

Models: SL280UH090V36B SL280UH070V36A DAVE LENNOX SIGNATURE COLLECTION GAS FURNACE UPFLOW / HORIZONTAL AIR DISCHARGE SL280UH090V48B

1 72
Download 72 pages 31.79 Kb
Page 13
Image 13
Venting

Venting

A 4−inch diameter flue transition is factory-installed on the combustion air inducer outlet of all models. Figure 15 shows the combustion air inducer as shipped from the factory.

Mounting Screws Location

mounting screws

mounting screw

FIGURE 14

UPFlow Position

UPFLOW POSITION

Top Vent Discharge

vent pipe

flue

collector box

transition

 

pressure

 

switch

 

make−up

 

box

 

AIR

FLOW

FIGURE 15

UPFlow PositionIMPORTANT

The unit will not vent properly with the flue transition pointed down in the 6 o’clock position.

The combustion air inducer may be rotated clock- wise or counterclockwise by 90° to allow for top or side vent discharge in all applications. When the unit is installed, the flue transition must be in the 9 o’clock, 12 o’clock or 3 o’clock position.

If necessary reposition the combustion air inducer, pres- sure switch and or make up box as needed per the follow- ing steps and see figures 15 through 21.

1 − Remove the four mounting screws (figure 14) which secure the combustion air inducer / pressure switch assembly to the orifice plate. Lift and rotate the assem- bly 90 degrees clockwise or counter clockwise to either the 3 o’clock position or to 9 o’clock position and re−se- cure with four screws. Gasket should be left in place.

2 − Use tin snips to cut preferred opening on the cabinet for repositioning the flue outlet. Use the cut out piece as a cover plate to patch unused opening on cabinet.

 

UPFLOW POSITION

 

 

Left Side Vent Discharge

 

cover plate

collector box

 

 

pressure

 

 

switch

 

 

vent pipe

 

make−up

 

 

box

flue

transition

AIR Manual background FLOW

SGas supply piping must be brought into the unit from the right side in order to accommodate the flue pipe.

SRemove make−up box assembly (2 screws) and cut wire tie to free make−up box wires. Re−install make−up box on other side of cabinet.

SRe−secure make−up box wires, either pulling excess wires through the blower compartment and securing with supplied wire tie, or coil excess wire and secure to the gas manifold.

FIGURE 16

UPFLOW POSITION

Right Side Vent Discharge

 

cover plate

collector box

flue transition

vent pipe

pressure Manual background switch Manual backgroundManual background

make−up

box

AIR Manual background FLOW

SPressure switch tubing may be too long. Cut to fit , then re−attach to barbed fitting on pressure switch. Tubing must not be allowed to sag.

FIGURE 17

Page 13

Page 13
Image 13
Lennox International Inc SL280UH070V36A, SL280UH090V48B, SL280UH090V36B installation instructions Venting, UPFlow Position