.51 DIA. |
|
|
| PEM NUT |
|
| |||
GROUND BUS | INPUT/OUTPUT BUS | |||
FRONT VIEW | RIGHT SIDE VIEW |
| NOTES: |
| 1. ALL DIMENSIONS ARE IN INCHES AND (MILLIMETERS). |
| 2. TOP AND BOTTOM CABLE ENTRY AVAILABLE THROUGH |
| REMOVABLE ACCESS PLATES. REMOVE, PUNCH TO SUIT |
| CONDUIT SIZE, AND REPLACE. |
| 3. CONTROL WIRING AND POWER WIRING MUST BE RUN |
| IN SEPARATE CONDUIT. OUTPUT CABLES SHOULD BE |
| RUN IN A SEPARATE CONDUIT FROM INPUT CABLES. |
| 4. ALUMINUM AND COPPER CLAD ALUMINUM CABLES ARE |
| NOT RECOMMENDED. |
| 5. ALL WIRING IS TO BE IN ACCORDANCE WITH NATIONAL |
PEM NUT | AND LOCAL ELECTRICAL CODES. |
6.HARDWARE KIT IS SUPPLIED FOR INPUT, OUTPUT, NEUTRAL, AND GROUND CABLE CONNECTIONS. KIT INCLUDES 1/2" BOLTS, WASHERS, AND NUTS FOR
Figure 17 Electrical field connections
29
CB1
CB4
NEUTRAL
BUS
CB3A
GROUND
BUS
FRONT VIEW
(WITH FRONT PANELS REMOVED)
SOURCE 1 INPUT Ø A, Ø B, Ø C
SOURCE 2 INPUT
ØA, Ø B, Ø C
CB2
CB5
SYSTEM OUTPUT Ø A, Ø B, Ø C
CB3
FRONT
NEUTRAL BUS | CONNECTING CABLES TO THE BUS BARS. |
| |||
RIGHT SIDE VIEW | 7. THE TORQUE REQUIREMENT FOR | ||||
| 428 |
|
|
| |
SOURCE 1 INPUT Ø A |
|
|
|
| |
SOURCE 1 INPUT Ø B |
|
|
|
| |
SOURCE 1 INPUT Ø C |
|
|
|
| |
NEUTRAL BUS |
|
|
|
|
|
SOURCE 1 |
|
| SOURCE 2 | ||
| CB1 |
|
| CB2 |
|
| K1 |
|
| K2 |
|
K2 K3 | CB4 | CB3A | CB3 | K1 K3 | CB5 |
| SYSTEM OUTPUT | |
SECTION | ||
PS212401 | ||
SIDE VIEW | ||
| Rev. 2 |
drawing: 400 – 600 amp STS2 with dual output breakers
Installation Drawings