46

FRONT

FRONT UPPER STS2 BRACKET

(2 PLACES)

CAP SCREW M12-1.75X40MM

SPLIT LOCK WASHER M12

FLAT WASHER M12 (SEE DETAIL C)

(2 PLACES)

CAP SCREW M12-1.75X40MM SPLIT LOCK WASHER M12 FLAT WASHER M12

REAR SIDE

REAR UPPER STS2 BRACKET

FIG. 1

BOTTOM VIEW OF STS2 WITH UPPER BRACKETS

REAR

REAR LOWER STS2 BRACKET

(3 PLACES)

CAP SCREW M12-1.75 x40mm

SPLIT LOCK WASHER M12 FLAT WASHER M12

FRONT

FIG. 3

TOP VIEW OF FLOOR STAND

WITH LOWER REAR MOUNTING BRACKET

INSTALLATION DRAWING

FOR SEISMIC FLOOR STAND

100-250A STS2

NOTE:

 

Figure

 

 

SEE DWGS PS215000, PS215002, AND PS215003

34

FOR DETAILS.

 

FRONT

REAR

Installation

FRONT UPPER

REAR UPPER

drawing,

 

STS2 BRACKET

STS2 BRACKET

seismicfloor

FIG. 2

LEVELER FOOT NUT

 

 

RIGHT SIDE VIEW OF STS2 WITH UPPER BRACKETS

 

 

 

stand 100

 

LEVELER FOOT

-250A

 

 

DETAIL C

REAR LOWER

BRACKET

REAR

FRONT

FIG. 4

RIGHT SIDE VIEW OF FLOOR STAND

WITH LOWER REAR MOUNTING BRACKET

PS215001 Rev. 0

Installation Drawings

Page 54
Image 54
Liebert POWER PROTECTION STATIC TRANSFER SWITCH manual Stand, Installation