PEM NUT
.51 DIA.
GROUND BUS | .51 DIA. | INPUT/OUTPUT BUS | |
FRONT VIEW | RIGHT SIDE VIEW | ||
|
NOTES:
1. ALL DIMENSIONS ARE IN INCHES AND (MILLIMETERS). |
2. TOP AND BOTTOM CABLE ENTRY AVAILABLE THROUGH |
REMOVABLE ACCESS PLATES. REMOVE, PUNCH TO SUIT |
CONDUIT SIZE, AND REPLACE. |
3. CONTROL WIRING AND POWER WIRING MUST BE RUN |
IN SEPARATE CONDUIT. OUTPUT CABLES SHOULD BE |
RUN IN A SEPARATE CONDUIT FROM INPUT CABLES. |
4. ALUMINUM AND COPPER CLAD ALUMINUM CABLES ARE |
NOT RECOMMENDED. |
5. ALL WIRING IS TO BE IN ACCORDANCE WITH NATIONAL |
AND LOCAL ELECTRICAL CODES. |
6. HARDWARE KIT IS SUPPLIED FOR INPUT, OUTPUT, |
NEUTRAL, AND GROUND CABLE CONNECTIONS. KIT |
INCLUDES 1/2" BOLTS, WASHERS, AND NUTS FOR |
CONNECTING CABLES TO THE BUS BARS. |
Figure 18 Electrical field connections
30
CB1
CB4
SOURCE 1 INPUT
Ø A, Ø B, Ø C
SOURCE 2 INPUT
ØA, Ø B, Ø C
CB2
CB5
GROUND
BUS
SYSTEM OUTPUT
ØA, Ø B, Ø C
CB3
NEUTRAL BUS
FRONT
NEUTRAL BUS RIGHT SIDE VIEW
7. THE TORQUE REQUIREMENT FOR |
428 |
SOURCE 1
INPUT Ø A
SOURCE 1
INPUT Ø B
SOURCE 1
INPUT Ø C
NEUTRAL
BUS |
|
|
|
|
SOURCE 1 |
| SOURCE 2 | ||
| CB1 |
| CB2 |
|
| K1 |
| K2 |
|
K2 K3 | CB4 | CB3 | K1 K3 | CB5 |
SYSTEM OUTPUT
drawing: 800 – 1000 amp STS2 with single output breaker
Installation
FRONT VIEW | SECTION |
SIDE VIEW | |
(WITH FRONT PANELS REMOVED) |
|
PS212800
Rev. 2