INSTALLATION
Ranger 10 and Ranger 300 D Installation
Table 4 lists the required and optional equipment for installing and operating the TIG Module with a Ranger 10 or Ranger 300 D.
Refer to Figure 4 for the TIG Module/Ranger 10 connection diagram and to Figure 4A for the TIG Module/Ranger 300 D connection diagram. Make sure all connections are tight before proceeding.
RANGER 10 / RANGER 300 D AND THE TIG MODULE
REQUIRED EQUIPMENT
|
|
|
|
|
|
|
|
|
| Control | Contactor | Work and | TIG | Work | Shielding Gas, | Arc Start |
|
| Cable | Kit | Electrode | Torch | Lead | Regulator, | Switch |
|
|
|
| Leads from |
|
| Flowmeter | - OR - |
|
|
|
| Ranger 10 to |
|
|
| Amptrol |
|
|
|
| TIG Module |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| User Supplied; | User | User Supplied; | User | See | |||
| Field | Length as | Supplied | Length as | Supplied | Optional |
| |
| Installed | Req’d. Cable |
| Req’d. Cable |
| Equipment |
| |
| plus |
| Sized to Match |
| Sized to Match |
| Below |
|
| 115V Plug |
| Current and |
| Current and |
|
|
|
|
|
| Duty Cycle |
| Duty Cycle |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
RANGER 10 / RANGER 300 D AND THE TIG MODULE
OPTIONAL EQUIPMENT
|
|
|
|
|
|
|
|
|
| Control | Water | Arc Start | Hand | Foot | Docking |
|
|
| Cable | Valve | Switch | Amptrol | Amptrol | Kit |
|
|
| Extension |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| K937 - [ ] | K814 | K963 | K870 |
| |||
| Extension |
|
|
|
| Mounts to |
|
|
|
|
|
|
| Ranger 10 |
|
| |
|
|
|
|
|
| Roof |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
TABLE 4
TIG MODULE | – 11 – |