INSTALLATION

Ranger 10-LX and Ranger 300D-LX Installation

Table 5 lists the required and optional equipment for installing and operating the TIG Module with a Ranger 10-LX or Ranger 300D-LX.

Refer to Figure 5 for the TIG Module/Ranger 10- LX connection diagram and Figure 5A for the TIG Module/Ranger 300D-LX connection diagram. Make sure all connections are tight before proceeding.

RANGER 10LX / RANGER 300D-LX AND THE TIG MODULE

REQUIRED EQUIPMENT

 

 

 

 

 

 

 

 

 

 

Control

Contactor

Work and

TIG

Work

Shielding Gas,

Arc Start

 

 

Cable

Kit

Electrode

Torch

Lead

Regulator,

Switch

 

 

 

 

Leads from

 

 

Flowmeter

- OR -

 

 

 

 

Ranger 10LX

 

 

 

Amptrol

 

 

 

 

to

 

 

 

 

 

 

 

 

TIG Module

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

K936-1

K938-1

User Supplied;

User

User Supplied;

User

See

 

9-pin to

Field

Length as

Supplied

Length as

Supplied

Optional

 

14-pin

Installed

Req’d. Cable

 

Req’d. Cable

 

Equipment

 

Plug

 

Sized to Match

 

Sized to Match

 

Below

 

 

 

Current and

 

Current and

 

 

 

 

 

 

Duty Cycle

 

Duty Cycle

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

RANGER 10LX / RANGER 300D-LX AND THE TIG MODULE

OPTIONAL EQUIPMENT

 

 

 

 

 

 

 

 

 

 

Control

Water

Arc Start

Hand

Foot

Docking

 

 

 

Cable

Valve

Switch

Amptrol

Amptrol

Kit

 

 

 

Extension

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

K937 - [ ]

K844-1

K814

K963

K870

K939-1

 

 

Extension

 

 

 

 

Mounts to

 

 

 

9-pin to 9-pin

 

 

 

 

Ranger 10LX

 

 

 

 

 

 

 

 

Roof

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TABLE 5

TIG MODULE

13

Page 22
Image 22
Lincoln Electric IM528-B manual Ranger 10-LX and Ranger 300D-LX Installation