Return to Section TOC

Return to Section TOC

Return to Section TOC

Return to Section TOC

Return to Master TOC

Return to Master TOC

Return to Master TOC

Return to Master TOC

F-39

TROUBLESHOOTING AND REPAIR

F-39

 

 

COVER AND SPINDLE MOUNT

REMOVAL AND REPLACEMENT PROCEDURE (Continued)

Figure F.15 - COVER AND SPINDLE MOUNT SCREW LOCATION

1/2" Bolt

Screw

 

Screw

 

Screw

Screw

Screw

 

REPLACEMENT PROCEDURE

1. Replace all leads to switches and solenoid.

2.Maneuver assembly into case.

3.Connect gas hose to conductor block.

4.Replace five mounting screws.

5.Replace bolt into top of case.

6.Replace the electrode cable into the cord grip. Replace and tighten the nut.

LN-15

Page 77
Image 77
Lincoln Electric SVM166-A service manual Bolt