DWBS Installation Checklist
Checklist
The following table is a checklist of tasks for completing a DWBS installation. Where appropriate, references to the corresponding pages for a description of the tasks indicated are also provided. Unless otherwise indicated, the page references are for the DWBS Installation document.
Table
Task: Have you... | Page | Yes/No |
|
|
|
Wired the CAUs according to the SDSC installation |
| |
plan? |
|
|
|
|
|
Oriented the CAUs (azimuth and tilt) according to the |
| |
SDSC installation plan using brackets when required? |
|
|
|
|
|
Wired the WFBs according to the SDSC installation |
| |
plan? |
|
|
|
|
|
Installed and wired the power supplies for each WFB |
| |
that has an attached CAU? |
|
|
|
|
|
Verified that the DC power leads for WFB are |
| |
“doubled up?” |
|
|
|
|
|
Placed the TN789 circuit packs into the appropriate |
| |
slots? |
|
|
|
|
|
Terminated WFBs 1A and 1B to ports 1 and 2 of the |
| |
first TN789 circuit pack? |
|
|
|
|
|
Terminated WFBs 2A and 2B to ports 1 and 2 of the |
| |
second TN789 circuit pack? |
|
|
|
|
|
Terminated all remaining WFBs properly? |
| |
|
|
|
Installed the WT download cable? |
| |
|
|
|
Upgraded the switch software to V5 or greater? |
| |
|
|
|
Enabled wireless capabilities via the Optional |
| |
Features form by entering the change |
|
|
|
|
|
(Remember to log off and log on again.) |
|
|
|
|
|
Enabled wireless capabilities via the |
| |
|
| |
entering the change |
|
|
command? |
|
|
|
|
|
Administered the |
| |
|
|
|