Matsushita CF-19FHGAX Line Processing of Antenna Cable of Main Unit, Cable Process 1/3

Models: CF-19FHGAX

1 90
Download 90 pages 6.17 Kb
Page 57
Image 57

Line Processing of Antenna Cable of Main Unit

Cable Process 1/3

Place brown/blue/gray cables at left and white/black cables downward.

After connecting the white antenna cable, connect it into the Holder as illustrated.

Safety Working

 

 

 

 

CAUTION

S1:Insulation S2:Pinching Cables S3:Sharp Edge

 

 

 

 

S4:Part No. Check S5:Others

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Attach side

Cable Process 2/3

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

After connecting the black antenna cable, connect it into the Holder as illustrated.

Connect the blue antenna cable.

 

0-2mm

Insert the FPC,

 

Lock Check

 

 

2-5mm

TAPE

 

After processing the cables, inserting the FPC and locking, incline the Audio PCB into the arrow direction.

After confirming the cable is not under the AUDIO PCB (processed at the Step 4), tighten the Screws. Because there is a possibility that the cable is scissored between PCB and the both.

SHEET

Remove the release paper and attach it.

To prevent from the cable damaged by screw head.

Process the grey cable to the same direction with the brown cable

S2

Insert it into the right

 

notch of the Clamper.

If the fixing is not incorrected, there is possibility

that the cable is scissored between the PCB and the both.

Check the blue cable from the hole.

Connect the FPC

Screw

Screw

Remove the Release Paper and attach it.

To prevent from the cable damage by screw bead.

57 / 90

Page 57
Image 57
Matsushita CF-19FHGAX service manual Line Processing of Antenna Cable of Main Unit, Cable Process 1/3