Nortel Networks 1002rp manual Rack power and grounding

Models: 1002rp

1 86
Download 86 pages 33.02 Kb
Page 53
Image 53
Rack power and grounding

October 2006

Power supply installation

Main panel wiring diagram with product number.

Rack power and grounding

To ensure a complete power and grounding installation:

„In rackmount server installations, ensure the CallPilot server chassis and equipment racks are isolated from other foreign sources of ground. Acceptable isolation methods include: isolation pads, grommeted washers, chassis side rail strips, and non-conducting washers.

„In rackmount server installations where other equipment is also installed in the same 19" rack, ensure that all equipment derives ground from the same service panel as CallPilot and the switch, whether or not the equipment is AC- or DC-powered.

1002rp Server Hardware Installation

53

Page 53
Image 53
Nortel Networks 1002rp manual Rack power and grounding