Nortel Networks manual To connect the 1002rp AC server to power

Models: 1002rp

1 86
Download 86 pages 33.02 Kb
Page 77
Image 77
To connect the 1002rp AC server to power

October 2006

Installing the server and connecting the peripheral devices

To connect the 1002rp AC server to power

WARNING

Risk of personal injury, risk of hardware failure

The power outlets used by the CallPilot server and its peripheral devices must be connected to the same single-point ground reference as the one used by the switch with MGate cards (NTRB18CA) connected to the CallPilot server. If this requirement is not met, power transients can cause personal injury, or hardware failure, or both. Refer to the Installation and Configuration Task List (555-7101-210) for more information on single-point grounding requirements.

1Plug the server AC power cord into the server rear panel.

2Plug the other end into a wall receptacle or power bar.

To connect the 1002rp DC server to power

DANGER

Risk of electrical shock

„Only qualified personnel can alter electrical connections.

„Ensure the power distribution unit (PDU) is turned off until you are instructed to turn it on.

1Connect the DC power cable to the server.

1002rp Server Hardware Installation

77

Page 77
Image 77
Nortel Networks manual To connect the 1002rp AC server to power, To connect the 1002rp DC server to power