October 2006

Preparing for installation

Unpacking the 1002rp server

Introduction

Follow this procedure to unpack the server and peripherals.

WARNING

Risk of personal injury

The 1002rp CallPilot server weighs approximately 34 kg (75 lb) as shipped from manufacturing. To prevent personal injury, have someone help you to unpack and position the server.

To unpack the equipment

ATTENTION

 

 

As you unpack each item, check it off against the

 

 

packing list, as well as against the following

 

checklists provided in the Installation and

 

Configuration Task List (555-7101-210):

 

„

“CallPilot software media and documentation

 

 

checklist”

 

„

“CallPilot server hardware checklist”

1Carefully open the cardboard carton containing the server.

2Remove the server from the carton; set it on the floor.

3Carefully open the cartons containing the monitor, keyboard, mouse, modem, and ELAN hub (if supplied), and set the peripherals aside.

4Put all manuals, CD-ROMs, operating system disks, and any disks for peripherals in a safe place.

1002rp Server Hardware Installation

37

Page 37
Image 37
Nortel Networks manual Unpacking the 1002rp server, To unpack the equipment