Task List

To unpack the equipment

37

To remove the front bezel

40

To remove the server cover

41

To inspect the server interior

42

To replace the front bezel after installation is complete

44

To install the power supply module

49

To bring DC power and ground into the PDU

57

To install the server

60

To set the modem DIP switches

63

To connect the mouse, keyboard, and monitor to the server

66

To connect the modem to the server

66

To connect the server to the ELAN

68

To connect the server to the CLAN

71

To install the software feature dongle

74

To connect the 1002rp AC server to power

77

To connect the 1002rp DC server to power

77

To start the server

78

1002rp Server Hardware Installation

9

Page 9
Image 9
Nortel Networks 1002rp manual Task List, To connect the mouse, keyboard, and monitor to the server