Nortel Networks 1002rp manual Connecting the server to power, Before you begin

Models: 1002rp

1 86
Download 86 pages 33.02 Kb
Page 75
Image 75
Connecting the server to power

October 2006

Installing the server and connecting the peripheral devices

Connecting the server to power

Before you begin

Ensure that proper power and grounding are available for all the power outlets serving the CallPilot server and its associated peripherals. Power for these devices must be wired and fused independently of all other receptacles, and referenced to the same ground as the PBX system.

Aqualified electrician must implement the single-point ground reference as required between the power outlets of the CallPilot server and the power outlets of the switch.

Provide a sufficient number of properly grounded power outlets or power bars for all equipment. For more information, refer to grounding and power requirements in this document and in the Planning and Engineering Guide (555-7101-101).

The single-point ground (SPG) required by the system can be an isolated ground (IG) bus or AC equipment ground (ACEG) bus in the service panel or transformer. The system must be connected to safety ground/protective earth in accordance with NEC requirements. For international use, the system must be connected to safety ground/protective earth in accordance with Paragraph 2.5 of EN60950/IEC950.

Note: Refer to Large System: Planning and Engineering (553-3021-120) for a complete description of approved ground sources and methods. Insulated ground wire must be used for system grounding.

1002rp Server Hardware Installation

75

Page 75
Image 75
Nortel Networks 1002rp manual Connecting the server to power, Before you begin