Nortel Networks 1002rp Then, replace the server cover and proceed with the hardware installation

Models: 1002rp

1 86
Download 86 pages 33.02 Kb
Page 43
Image 43
October 2006

October 2006

Preparing for installation

IF

THEN

you are satisfied that the 1002rp server has arrived at your site undamaged

replace the server cover and proceed with the hardware installation.

See “Installation checklist” on page 34.

Note: Do not reinstall the front bezel until the server is in its final location and the CallPilot installation is complete.

1002rp Server Hardware Installation

43

Page 43
Image 43
Nortel Networks 1002rp manual Then, replace the server cover and proceed with the hardware installation, October